Major Residential Development at the Former Cleddau Bridge Hotel, Essex Road, Pembroke Dock, SA72 6HZ
“Demolition of redundant derelict hotel and redevelopment with 35 affordable housing units with landscaping and biodiversity enhancements.”
Town and Country Planning (Development Management Procedure) (Wales) Order 2012
In line with the Town and Country Planning (Development Management Procedure) (Wales) Order 2012 prior to the formal submission of a planning application to the Local Planning Authority (“LPA”), the applicant (Castell Group Ltd) is required to undertake a pre-application consultation so that people have the opportunity to provide comments directly to them prior to the submission. It should be noted, however, that following this exercise, and once the planning application is formally submitted to the LPA, representation can still be made directly to the LPA within their consultation period. As with all planning applications any comments submitted may be placed on the public file.
We therefore give notice that Castell Group Ltd are intending to apply for planning permission for the following:
“Demolition of redundant derelict hotel and redevelopment with 35 affordable housing units together with landscaping and biodiversity enhancements.”
All relevant documentation (i.e. application, plans, drawings, supporting information) are available to review at the end of this page (via links / pdf downloads).
Anyone who wishes to make representations about this proposed development must do so by the Friday 18th October 2024 (with the formal consultation period commencing on Wednesday 18 th September 2024). Responses should be emailed or posted to Hayston Development & Planning Ltd, details of which are provided below. For ease, a standard response form is also available below to download.
Hayston Developments & Planning Ltd. Planning Studio, Hayston Bridge, Johnston, Haverfordwest, Pembrokeshire, SA62 3HJ
Email: andrew@haystonplanning.co.uk
Tel: 01437 891817 Mobile: 07515 851704
www.haystonplanning.co.uk
If you do not have internet access then you can contact us directly on 01437 891817 to discuss the proposed development or request a hardcopy of the application.
Planning Application Documents (click links below)
- Castell-Group-Ltd-Former-Cleddau-Bridge-Hotel-PREAPP-Planning-Report-2024.docx.pdf
- Application-Form.pdf
- R594 S-01 Site Location & Topographic Survey.pdf
- R594 P-02A Proposed Site Plan.pdf
- R594 P-03 Boundary Treatment Plan.pdf
- R594-P-04-Site-Sections_Street-Elevations.pdf
- R594-P-05-3D-Views-Map-Key.pdf
- R594-P-06-Domestic-Lighting-Plan.pdf
- R594-P-07-Proposed-External-Finishes-Site-Plan.pdf
- R594-P-08-Proposed-External-House-Type-Finishes.pdf
- R594-P-09-Typical-Garden-Arrangement-Plan.pdf
- R594-P-10-2P1B-Detached-Flats.pdf
- R594-P-11-2P1B-Semi-Detached-Flats.pdf
- R594-P-12-2P1B-Semi-Detached-Gable-Entrance-Flats.pdf
- R594-P-13-4P2B-Semi-Detached-House.pdf
- R594-P-14-4P2B-Terraced-House.pdf
- R594-P-15-5P3B-Semi-Detached-House.pdf
- R594-P-16-6P4B-Semi-Detached-House.pdf
- R594-S-01-Site-Location-Topographic-Survey.pdf
- Appendix-A.pdf
- Appendix-B-Planning-Decision.pdf
- Appendix-B-Commitee-Report.pdf
- Appendix-C-Planning-Decision.pdf
- Appendix-C-Committee-Report.pdf
- Appendix-D.pdf
- Appendix-E.zip
- Appendix-F-LPA-pre-app-response.pdf
- Appendix-G-Welsh-Government-Concept-Stage.pdf
- Appendix-H-Transsport-Statement.pdf
- Appendix-I-PEA-Cleddau-Bridge-Hotel-2024-FINAL.pdf
- Appendix-J-Tree-Survey-Report.pdf
- Appendix-J-Tree-Protection-Plan.pdf
- Appendix-K-Landscaping-Plan-and-GIS.zip
- Appendix-L.zip
- Appendix-M-Site-Investigation-Survey.pdf
- Consultation-Response-Form_English.docx
- Consultation-Response-Form_Welsh.docx
Get In Touch With Us
Hayston Development and Planning Ltd
The Planning StudioHayston Bridge
Johnston, Haverfordwest
Pembrokeshire, SA62 3HJ